スイス
スイス

myGeobrugg

 - Codelco El Teniente Copper Mine 2016

MINAX® mesh during Installation works with Geobrugg's MESHA® handler - no miners are exposed to work under unsupported hanging walls

 - Codelco El Teniente Copper Mine 2016

Atlas Copco Boltec with MESHA® handler by Geobrugg

 - Codelco El Teniente Copper Mine 2016

Tunnel walls covered with MINAX® 65/4 - thanks to knotted mesh ends, overlapping is minimized

 - Codelco El Teniente Copper Mine 2016

Detail of the ground support with MINAX® mesh, which is nicely following tunnel contour and can be pre-tensioned to minimize deformations during eventual rockbursts

 - Codelco El Teniente Copper Mine 2016

View of the ventilation tunnel at the New Mine Level being supported with MINAX® 65/4 and MINAX® 80/4

 

設置年

2016

状況

El Teniente in Chile is the world largest underground copper mine.  Due to specific rock conditions, the risk of rock bursts is very high.  Since security standards at Codelco are amongst the highest worldwide, margins for failure from rock bursts are very low.  In the past, several rock bursts have affected personnel and operations.

説明

To protect people and equipment at El Teniente, a combination of shotcrete with MINAX® 65/4 and/or MINAX® 80/4 was used.  This solution was successfully tested at Geobrugg's dynamic test center in Walenstadt, Switzerland.  Results were above satisfactory.

In addtion to the MINAX® mesh, installation was completely mechanized with Geobrugg's handler called, MESHA®.  MESHA® increases safety and the efficiency of the ground.

顧客名

Codelco - the National Copper Corporation of Chile / El Teniente mine

保護対象

鉱山/採石場

腐食防止

ジェオブルッグ スーパーコーティング

下請

Salfa Montajes (Salfacorp S.A.) / Züblin International GmbH Chile SpA

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム