スイス
スイス

myGeobrugg

 - Hydroelectric plant - Hidro-Ituango 2017

Front view of the slope

 - Hydroelectric plant - Hidro-Ituango 2017

Stabilized slope

 - Hydroelectric plant - Hidro-Ituango 2017

Building process

 - Hydroelectric plant - Hidro-Ituango 2017

Lateral view of the slope

 - Hydroelectric plant - Hidro-Ituango 2017

Slope covered with TECCO® STAINLESS G65/3

 

設置年

2017

状況

Due to the filling levels of the dam, it was necessary to guarantee the uninterrupted operability of the tunnels during the life of the project and to prevent the damage caused by large block slides in the portals.

The designer company (Integral S.A.) required a completely stainless stabilization because it will be submerged and affected by the oxidizing agents of this water.

説明

Geobrugg has the only stainless steel stabilization system on the market, TECCO® STAINLESS. This system of stainless steel increases the life cycle and reduces susceptibility to corrosion.

Because of the experience, they have in this type of project the system was installed by WARCO S.A.S. - especially as access, drilling, and injection were demanding. With highest quality standards more than 1'500 m² were stabilized.

顧客名

Consorcio CCC Ituango

落札者

WARCO S.A.S

保護対象

インフラ

腐食防止

ステンレス

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム