İsviçre
İsviçre

myGeobrugg

Hydroelectric plant - Hidro-Ituango

Şev ve Yamaç koruma - Hydroelectric plant - Hidro-Ituango 2017

Front view of the slope

Şev ve Yamaç koruma - Hydroelectric plant - Hidro-Ituango 2017

Stabilized slope

Şev ve Yamaç koruma - Hydroelectric plant - Hidro-Ituango 2017

Building process

Şev ve Yamaç koruma - Hydroelectric plant - Hidro-Ituango 2017

Lateral view of the slope

Şev ve Yamaç koruma - Hydroelectric plant - Hidro-Ituango 2017

Slope covered with TECCO® STAINLESS G65/3

 

Kurulum Yılı

2017

Durum

Due to the filling levels of the dam, it was necessary to guarantee the uninterrupted operability of the tunnels during the life of the project and to prevent the damage caused by large block slides in the portals.

The designer company (Integral S.A.) required a completely stainless stabilization because it will be submerged and affected by the oxidizing agents of this water.

Açıklama

Geobrugg has the only stainless steel stabilization system on the market, TECCO® STAINLESS. This system of stainless steel increases the life cycle and reduces susceptibility to corrosion.

Because of the experience, they have in this type of project the system was installed by WARCO S.A.S. - especially as access, drilling, and injection were demanding. With highest quality standards more than 1'500 m² were stabilized.

Müşteri

Consorcio CCC Ituango

Yüklenici

WARCO S.A.S

Gösterilen obje

Infrastructure

Korozyon koruması

INOX / STAINLESS

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta