Suíça
Suíça

myGeobrugg

Hydroelectric plant - Hidro-Ituango

Estabilização de taludes - Hydroelectric plant - Hidro-Ituango 2017

Front view of the slope

Estabilização de taludes - Hydroelectric plant - Hidro-Ituango 2017

Stabilized slope

Estabilização de taludes - Hydroelectric plant - Hidro-Ituango 2017

Building process

Estabilização de taludes - Hydroelectric plant - Hidro-Ituango 2017

Lateral view of the slope

Estabilização de taludes - Hydroelectric plant - Hidro-Ituango 2017

Slope covered with TECCO® STAINLESS G65/3

 

Ano de instalação

2017

Situação inicial

Due to the filling levels of the dam, it was necessary to guarantee the uninterrupted operability of the tunnels during the life of the project and to prevent the damage caused by large block slides in the portals.

The designer company (Integral S.A.) required a completely stainless stabilization because it will be submerged and affected by the oxidizing agents of this water.

Descrição

Geobrugg has the only stainless steel stabilization system on the market, TECCO® STAINLESS. This system of stainless steel increases the life cycle and reduces susceptibility to corrosion.

Because of the experience, they have in this type of project the system was installed by WARCO S.A.S. - especially as access, drilling, and injection were demanding. With highest quality standards more than 1'500 m² were stabilized.

Promotor

Consorcio CCC Ituango

Contratante

WARCO S.A.S

Objecto protegido

Infra-estrutura

Proteção contra a corrosão

INOX / STAINLESS

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail