Szwajcaria
Szwajcaria

myGeobrugg

Ochrona przed obrywami skalnymi - San Salvatore 2 2023

Additional rockfall barriers now protect the pathways on the east side of San Salvatore.

Ochrona przed obrywami skalnymi - San Salvatore 2 2023

Installation work for the highest RXE-5000 barrier in Switzerland.

Ochrona przed obrywami skalnymi - San Salvatore 2 2023

Installation of TECCO G65/3 secondary mesh.

 

Dlugosc systemu od

- 1300 m

 

Rok Instalacji / Montazu

2023

Sytuacja początkowa

The Swiss Federal Railways (SBB) railroad line and the cantonal road between Lugano and Melide are confronted with frequent rockfall from the rock faces of Monte Salvatore, which are up to 600 m high. Similar to the safety measures taken in 2016, this latest project also aimed to protect these important traffic routes on Lake Lugano from rockfall.

Opis zastosowanego rozwiazania

This project included the installation of 16 new rockfall barriers with a total length of approx. 1'300 meters. Moreover, about 500 meters of existing barriers were reinforced.

The newly installed RXE-type barriers have different absorption energies ranging from 500 to 5'000 kJ. The last ones, with a height of 9 meters, hold the record for the highest post in Switzerland. In addition, around 10'000 m² of TECCO G65/3 mesh was installed.

Construction work began in the spring of 2021 and ended in mid-2023.

Kraj / Region

Szwajcaria

Chroniony Objekt

Road, Railway

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Western Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Western Switzerland

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Project Manager Sales Eastern Switzerland

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria Country Manager Southern Switzerland

Formularz kontaktowy