スイス
スイス

myGeobrugg

 - San Salvatore 2 2023

Additional rockfall barriers now protect the pathways on the east side of San Salvatore.

 - San Salvatore 2 2023

Installation work for the highest RXE-5000 barrier in Switzerland.

 - San Salvatore 2 2023

Installation of TECCO G65/3 secondary mesh.

 

システム延長

- 1300 m

 

設置年

2023

状況

The Swiss Federal Railways (SBB) railroad line and the cantonal road between Lugano and Melide are confronted with frequent rockfall from the rock faces of Monte Salvatore, which are up to 600 m high. Similar to the safety measures taken in 2016, this latest project also aimed to protect these important traffic routes on Lake Lugano from rockfall.

説明

This project included the installation of 16 new rockfall barriers with a total length of approx. 1'300 meters. Moreover, about 500 meters of existing barriers were reinforced.

The newly installed RXE-type barriers have different absorption energies ranging from 500 to 5'000 kJ. The last ones, with a height of 9 meters, hold the record for the highest post in Switzerland. In addition, around 10'000 m² of TECCO G65/3 mesh was installed.

Construction work began in the spring of 2021 and ended in mid-2023.

エンジニアリング

保護対象

道路, 鉄道

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム