Mar del Plata - Quarry

Avenida de los Trabajadores, B7603HYI, Mar del Plata, Argentyna
2020
Chroniony Objekt
Infrastructure
Ochrona przeciwerozyjna
GEOBRUGG SUPERCOATING
Zabezpieczona powierzchnia
540 m²
Wysokość skarpy
20 m
Nachylenie skarpy
70 ° - 90 °
Wystawy
South-East
Inne zainstalowane aplikacje
Ochrona przed obrywami skalnymi
Sytuacja początkowa

The 9 de Julio thermal power plant is located in an old quarry, which emerged when rocks for the construction of the breakwaters of the city were extracted. The blasting of the rock left vertical slopes with a height of 20 meters - they show continuous rockfalls. A few meters from these slopes, there is a gas pipeline and a fuel oil pipeline feeding the boiler of this plant.

Geologia

Fragmented sandstone. 

Opis zastosowanego rozwiazania

After several rockfalls events and with the aim of preserving the integrity of these gas and fuel oil pipelines, a protection system was implemented. The closest 30 linear meters of slope to these pipelines were intervened, installing a drape system.

Osoba kontaktowa na miejscu

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Zagrożeniami naturalnymi
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / USA
Saleh Feidi
Saleh Feidi
Regional Manager California
Zagrożeniami naturalnymi
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / USA
John Kalejta
John Kalejta
Regional Manager Central US
Zagrożeniami naturalnymi
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / USA
Bob Lyne
Bob Lyne
Regional Manager Southeast
Zagrożeniami naturalnymi
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / USA
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Zagrożeniami naturalnymi
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Zagrożeniami naturalnymi
Geobrugg North America, LLC
Salem OR 97302 / USA