The 9 de Julio thermal power plant is located in an old quarry, which emerged when rocks for the construction of the breakwaters of the city were extracted. The blasting of the rock left vertical slopes with a height of 20 meters - they show continuous rockfalls. A few meters from these slopes, there is a gas pipeline and a fuel oil pipeline feeding the boiler of this plant.

地質學

Fragmented sandstone. 

描述

After several rockfalls events and with the aim of preserving the integrity of these gas and fuel oil pipelines, a protection system was implemented. The closest 30 linear meters of slope to these pipelines were intervened, installing a drape system.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国