Mobilne ogrodzenia drogowe - Clarea Bridge 2020

Clarea bridge, Susa Italy

Mobilne ogrodzenia drogowe - Clarea Bridge 2020

Sleeves were installed every 4 m to attach the panels to the bridge

Mobilne ogrodzenia drogowe - Clarea Bridge 2020

A particularly high performance crane was used to lift the mesh panels from the pre-assembly area to the deck

Mobilne ogrodzenia drogowe - Clarea Bridge 2020

Panels installed into sleeves

Mobilne ogrodzenia drogowe - Clarea Bridge 2020

Mobile debris fence panel has minimal visual impact

Mobilne ogrodzenia drogowe - Clarea Bridge 2020

Sleeved mobile debris fence system protects both the traffic above and the tunnel below

Mobilne ogrodzenia drogowe - Clarea Bridge 2020

Secondary mesh installed in order to stop small debris from dropping off the bridge

 
 

Dlugosc systemu od

2540 m

 

Rok Instalacji / Montazu

2020

Sytuacja początkowa

The Trans-European Network Transport is building a new railway line from Lyon to Turin to complete the Mediterranean Corridor. Near Turin, the railway line passes under the Clarea Bridge. Therefore, starting with the works, the railway line had to be protected from falling objects. Due to the project's international significance, the customer wanted to install a tested and approved system.

Opis zastosowanego rozwiazania

Our mobile debris fence system was modified to the Clarea bridge. Instead of using concrete barriers for panel fixation, external sleeves had to be developed, which could be mounted to the bridge. As the fixation method was changed to the original homologated mobile debris fence system, intensive testing took place following the FIA Standard 3502-2018 debris fence. The test procedure includes a car impact with a speed of 120 kph, which exceeds the speed driven in this bridge section.

As delivery via several tunnels was impossible, the panels assembly took place under the bridge. The panel racks were driven to the site along the bridge for installation. One half of the bridge site conditions required a large crane to lift the panel racks to the installation truck. This service, along with the sleeve and panel installation, was provided as a turnkey solution.

For enhanced safety, a secondary mesh layer was installed to prevent small objects from falling.

The complete project foresees about 2'540 meters of barriers on the two parallel freeway lanes (four sides).

Kraj / Region

Włoch

Inwestor

Wykonawca

Inne przedsiębiorstwa

Chroniony Objekt

Road, Railway

Osoba kontaktowa na miejscu

Saleh Feidi
 

Saleh Feidi

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

Formularz kontaktowy

Bryant Jackson
 

Bryant Jackson

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / USA

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

Formularz kontaktowy

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / USA

Formularz kontaktowy