Ochrona przed obrywami skalnymi - Brombänz Tunnelportal 2025

The new ROCCO-1000 barrier above the portal is single-field (MEL-S) tested

Ochrona przed obrywami skalnymi - Brombänz Tunnelportal 2025

The Rhaetian Railway crosses the Landwasser River on a viaduct between Davos Wiesen and Davos Monstein; the new single-field barrier was installed above the portal of the Brombänztunnel I

Ochrona przed obrywami skalnymi - Brombänz Tunnelportal 2025

Installation with a Helicopter

Ochrona przed obrywami skalnymi - Brombänz Tunnelportal 2025

Installation work on the right-hand side post

Ochrona przed obrywami skalnymi - Brombänz Tunnelportal 2025

The posts with climbing aids, which are also tested as anchor points in accordance with EN 795:2012

Ochrona przed obrywami skalnymi - Brombänz Tunnelportal 2025

Setting the shackle connection at the ring net

Ochrona przed obrywami skalnymi - Brombänz Tunnelportal 2025

Quick and easy installation - the five-meter-high single-field barrier was installed within a few hours.

 

Zastosowane systemy

 

Dlugosc systemu od

12 m

 

Rok Instalacji / Montazu

2025

Sytuacja początkowa

The Rhaetian Railway periodically clears rocks from the western portal of the Brombänztunnel I in Davos Wiesen. During rock clearance in 2021, various loose stones and boulders were discovered, along with stacked, separated fissures. During the clearance work, it was also observed that the portal had been obstructed by loose stones and boulders that had fallen onto the railway track.

A risk assessment analyzing the condition of the rock face and evaluating potential risks, as well as a geological assessment, revealed that rock clearance is not a sufficient long-term protective measure due to the various rocks and boulders at risk of falling in the medium to long term and the danger of these falling over the tunnel portal.

Opis zastosowanego rozwiazania

As recommended, a rockfall protection net was installed above the west portal of the Brombänztunnel I as an economical, practical, and sustainable solution.

Due to the limited length, a single-field system was chosen. As several blocks can fall simultaneously, a rockfall protection net with an energy absorption capacity of at least 1,000 kJ and a height of five meters was installed.

Kraj / Region

Szwajcaria

Wykonawca

Chroniony Objekt

Railway

Ochrona przeciwerozyjna

Galvanized

Osoba kontaktowa na miejscu

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA Regional Manager California

Formularz kontaktowy

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

Formularz kontaktowy

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / USA Regional Sales Manager Pacific Northwest and Hawaii

Formularz kontaktowy