미국
미국

myGeobrugg

Brombänz Tunnelportal

낙석방호시스템 - Brombänz Tunnelportal 2025

The new ROCCO-1000 barrier above the portal is single-field (MEL-S) tested

낙석방호시스템 - Brombänz Tunnelportal 2025

The Rhaetian Railway crosses the Landwasser River on a viaduct between Davos Wiesen and Davos Monstein; the new single-field barrier was installed above the portal of the Brombänztunnel I

낙석방호시스템 - Brombänz Tunnelportal 2025

Installation with a Helicopter

낙석방호시스템 - Brombänz Tunnelportal 2025

Installation work on the right-hand side post

낙석방호시스템 - Brombänz Tunnelportal 2025

The posts with climbing aids, which are also tested as anchor points in accordance with EN 795:2012

낙석방호시스템 - Brombänz Tunnelportal 2025

Setting the shackle connection at the ring net

낙석방호시스템 - Brombänz Tunnelportal 2025

Quick and easy installation - the five-meter-high single-field barrier was installed within a few hours.

 

Systems

 

시스템 길이

12 m

 

설치 년도

2025

Situation

The Rhaetian Railway periodically clears rocks from the western portal of the Brombänztunnel I in Davos Wiesen. During rock clearance in 2021, various loose stones and boulders were discovered, along with stacked, separated fissures. During the clearance work, it was also observed that the portal had been obstructed by loose stones and boulders that had fallen onto the railway track.

A risk assessment analyzing the condition of the rock face and evaluating potential risks, as well as a geological assessment, revealed that rock clearance is not a sufficient long-term protective measure due to the various rocks and boulders at risk of falling in the medium to long term and the danger of these falling over the tunnel portal.

Description

As recommended, a rockfall protection net was installed above the west portal of the Brombänztunnel I as an economical, practical, and sustainable solution.

Due to the limited length, a single-field system was chosen. As several blocks can fall simultaneously, a rockfall protection net with an energy absorption capacity of at least 1,000 kJ and a height of five meters was installed.

Country/Region

스위스

Engineering

Contractor

Protected object

Railway

부식방지

Galvanized

Your local contact

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
충격 보호
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국 Regional Manager California

이메일

Bryant Jackson
 

Bryant Jackson

자연 재해
충격 보호
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / 미국

이메일

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

자연 재해
충격 보호
Geobrugg North America, LLC,KS 67226 Wichita / 미국 Regional Manager Rocky Mountains / Central USA

이메일

Robert Long
 

Robert Long

Regional Sales Manager Southeast

자연 재해
충격 보호
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 미국 Regional Sales Manager Southeast

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

이메일

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

자연 재해
충격 보호
Geobrugg North America, LLC,OR 97302 Salem / 미국 Regional Sales Manager Pacific Northwest and Hawaii

이메일