USA
USA

myGeobrugg

ATTENUATOR: Redirect and guide rockfall efficiently

The ATTENUATOR System is a modified rockfall drape providing particularly efficient protection. The upper part deflects the falling rock and the drape directs the rock to the designated runout zone. This low-maintenance protection solution is used where high-frequency rockfall events are expected.

Geobrugg Attenuators are easily dimensioned with the free online tool ATTERO.

Łatwe wymiarowanie z ATTERO

Tested in large-scale field tests the ATTENUATOR is the first solution of its kind that can be efficiently dimensioned. This is done with the free online tool ATTERO.

Zdolność do absorpcji wielu uderzeń

The flexibility of the system ensures safety even after several impacts.

Kurtyny/siatki z drutu stalowego o wysokiej wytrzymałości na rozciąganie

Protection against dynamic and point loads: Optimum impact load distribution to the flexible high-tensile steel mesh and anchors prevents puncturing and system failure.

Bariera z funkcją samoczynnego oczyszczania

Redirected rockfall is safely guided into the runout zone, allowing the rocks to be removed quickly in an area of easy access thus reducing costs.

Videos

Geobrugg ATTENUATOR development

Referencje

To the project
Bannholz

Rüthi SG, Szwajcaria

 

Zastosowane systemy

ATT-60

 

Rok Instalacji / montazu

2023

To the project
Saint Beat (Haute Garonne)

Saint Béat, Francja

 

Zastosowane systemy

ATT-60

 

Rok Instalacji / montazu

2020

To the project
Kaikoura State Highway 1 (SR14)

Kaikoura SH1, Nowa Zelandia

 

Zastosowane systemy

RXE-2000
ATTENUATOR Customized

 

Rok Instalacji / montazu

2017

To the project
Kaikōura SH1 - SR8 and 9

Kaikōura, Nowa Zelandia

 

Zastosowane systemy

ATT-60

 

Rok Instalacji / montazu

2021

To the project
Stanwell Park, Railway Corridor, 2020

Stanwell Park New South Wales, Australia

 

Zastosowane systemy

Rockfall drape
ATTENUATOR Customized

 

Rok Instalacji / montazu

2020

To the project
Kopalnia Miedzi Kanmantoo

Kanmantoo, Australia

 

Zastosowane systemy

T35
Rockfall drape
RXE-3000
TECCO® G65/4
SPIDER®
DELTAX®
MINAX® 80/3
DELTAX® G80/2
ATT-60

 

Rok Instalacji / montazu

2019

To the project
Clackamas Highway, Oregon, OR224

Estacada, Oregon, USA

 

Zastosowane systemy

ATT-40

 

Rok Instalacji / montazu

2015

To the project
Canadian Malartic Mine CMM

Malartic, Kanada

 

Zastosowane systemy

TECCO® G65/3
ATT-30

 

Rok Instalacji / montazu

2019

To the project
Alishan, Chiayi County

Chiayi County, Tajwan

 

Zastosowane systemy

ATTENUATOR Customized

 

Rok Instalacji / montazu

2018

To the project
South African Open Pit Mine

N/A, Południowa Afryka

 

Zastosowane systemy

ATT-30

 

Rok Instalacji / montazu

2018

To the project
Kelowna

West Kelowna, BC, Kanada

 

Zastosowane systemy

ATT-60

 

Dlugosc systemu

20 m

 

Rok Instalacji / montazu

2017

Kontakt

Geobrugg North America LLC Algodones
   

Geobrugg North America LLC Algodones

North America

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Impact Protection
Monitoring
Kevin Coyle
   

Kevin Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Saleh Feidi
   

Saleh Feidi

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
John Kalejta
   

John Kalejta

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Bob Lyne
   

Bob Lyne

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Pierce Runnels, Civil Engineer
     

Pierce Runnels, Civil Engineer

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Tim Shevlin
   

Tim Shevlin

Zagrożeniami naturalnymi