Szwajcaria
Szwajcaria

myGeobrugg

Ochrona przed obrywami skalnymi - Kaikoura State Highway 1 (SR14) 2017

Looking North - 4 m RXE-2000 hybrid attenuator with drape: on the left side TECCO® G65/3

Ochrona przed obrywami skalnymi - Kaikoura State Highway 1 (SR14) 2017

Looking South - the SH1 protected by the 4 m high RXE-2000 hybrid attenuator with drape

Ochrona przed obrywami skalnymi - Kaikoura State Highway 1 (SR14) 2017

Looking West SH1 - rockface with hybrid attenuator with drape

 
 

Rok Instalacji / Montazu

2017

Sytuacja początkowa

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750,000 m³ of material from source zones up to 500 m above sea level.  The highly fractured greywacke meant frequent future shallow landslides had to be expected. Barriers in several locations were necessary before the reopening of the SH1 road and railway below.

The rockfall frequency requires for a system that attenuates the rockfall energy to a manageable level, minimises maintenance and enables easy clearing.

Opis zastosowanego rozwiazania

A 4 m RXE-2000 rockfall barrier was modified into an 89 m Hybrid Attenuator with a 12/3/350 ROCCO® ringnet tail. This system enables the rockfall energy to be attenuated and guided into a catchment area at the toe of the slope for easier clearing maintenance.

The post spacing is between 8 and 12 m depending on topography. Several more attenuator systems are planned along the corridor where there is sufficient space at the bottom of the slope for retainment.

Read more about the other Kaikoura projects:

Kraj / Region

Nowa Zelandia

Inwestor

NCTIR /NZTA

Wykonawca

Geovert

Chroniony Objekt

Road

Ochrona przeciwerozyjna

GEOBRUGG ULTRACOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Western Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Western Switzerland

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Formularz kontaktowy

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria , Msc. Env. Eng.

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria Country Manager Southern Switzerland

Formularz kontaktowy