アメリカ合衆国
アメリカ合衆国

myGeobrugg

 - DB SoFo Kestert 2021

After the rockfall, the area was stabilized with mesh

 - DB SoFo Kestert 2021

After the 15'000 tons rockfall event

 - DB SoFo Kestert 2021

6'500 square meters were stabilized

 - DB SoFo Kestert 2021

Upper line of the netting

 
 

設置年

2021

状況

In March 2021, a rockfall of around 15,000 tons occurred near Kestert. The track and the road underneath had to be closed.

説明

After scaling and clearing works, the protective netting was installed. The nailings are between six and twelve meters long. Other at-risk sections were secured with SPIDER S3-130 and SPIDER S4-130.

国名

ドイツ

顧客名

エンジニアリング

落札者

Feldhaus Bergbau GmbH & Co. KG, Karl-Heinz Schneider Baugeschäft GmbH, Schönberger Bau GmbH & Co. KG

保護対象

道路, 鉄道

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / アメリカ合衆国 Regional Manager Northeast

お問い合わせフォーム

Saleh Feidi
 

Saleh Feidi

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / アメリカ合衆国

お問い合わせフォーム

John Kalejta
 

John Kalejta

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / アメリカ合衆国

お問い合わせフォーム

Bob Lyne
 

Bob Lyne

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / アメリカ合衆国

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / アメリカ合衆国

お問い合わせフォーム