Estabilización de taludes - DB SoFo Kestert 2021

After the rockfall, the area was stabilized with mesh

Estabilización de taludes - DB SoFo Kestert 2021

After the 15'000 tons rockfall event

Estabilización de taludes - DB SoFo Kestert 2021

6'500 square meters were stabilized

Estabilización de taludes - DB SoFo Kestert 2021

Upper line of the netting

 
 

Año de instalación

2021

Situación inicial

In March 2021, a rockfall of around 15,000 tons occurred near Kestert. The track and the road underneath had to be closed.

Descripción

After scaling and clearing works, the protective netting was installed. The nailings are between six and twelve meters long. Other at-risk sections were secured with SPIDER S3-130 and SPIDER S4-130.

País / Región

Alemania

Cliente

Ingeniería

Subcontratista

Feldhaus Bergbau GmbH & Co. KG, Karl-Heinz Schneider Baugeschäft GmbH, Schönberger Bau GmbH & Co. KG

Objeto protegido

Carretera, Ferrocarril

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Country Manager Southern Switzerland

Correo electrónico