Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg)

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

Short set made up of two edge nets. In the background on the left, you can see the Grünsee mid-station at 1,742 m above sea level. The ropeway then continues to Rudolfshütte at 2,315 m above sea level.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

Overview of the project area with the potential starting zones and the ropeway line to be protected. The double supports are most at risk. They are to be protected against any flowing avalanches that may occur by an additional diversion dam made of natural stone.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The existing wooden avalanche guards have been severely damaged due to frequent rockfalls and weathering. They not longer guarantee the protection required and are therefore being removed.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The avalanche nets from the SPIDER® Avalanche system have not just proven their capabilities as an ideal avalanche construction – they have also been successfully tested against rockfall. This durability when faced with falling rocks is the key advantage of the Geobrugg system.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The pressure plate forms the ideal foundation for the supports in terrain with a 45° incline and a rocky substrate. It is loosely held in position with two ground ropes anchored on the slope, on leveled terrain measuring around 0.7 m x 0.7 m.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The avalanche nets are fixed to the uphill rope anchor with a retention rope, which is cut to size at the factory, with the corresponding number of loops. The rope anchor used is relatively insusceptible to the rockfalls which happen regularly here.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The SPIDER® net surface is supplied from the factory with a screen-like fixed fine mesh and prevents the snow from penetrating.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

View of the supports to be protected on the Weißsee glacier ropeway.

Prévention des avalanches - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

From the gondola, the avalanche nets blend seamlessly into the alpine landscape – they are hardly noticeable.

 

Longueur du système

8 m - 28 m

 

Année d’installation

2016

Situation de départ

Falling rocks and weathering had damaged the previous wooden avalanche protection structure. The original protective function had to be restored. Furthermore, other hazardous areas had to be secured in order to provide better protection for the entire ropeway system.

In the project which was originally submitted, the intention was to construct massive avalanche wedges made of reinforced concrete. These were designed to directly protect double supports 21a and 21b, as well as support 22. On account of the enormous dimensions of this structure, the associated costs, and the considerable impact on the landscape – in a conservation area on the edge of the Hohe Tauern National Park, a new protection project was created.

Description

The new protection concept combines three elements:
•    permanent protection against avalanches through an avalanche protection structure       made of snow nets
•    temporary protection against avalanches through avalanche blasting in conjunction with
•    an avalanche diversion dam to protect objects

Overall, eight sets of SPIDER® Avalanche snow nets with a total length of 140 meters are being erected in three potential avalanche starting zones. With this measure, it is only necessary to construct a 35-meter-long and approximately 3-meter-high dam made of locally acquired, heavy rubble.

With the hardly visible snow nets and natural dam, the authorities were extremely satisfied in terms of conservation of nature and the landscape.

Client

Weißsee Gletscherwelt GmbH

Ingénierie

Ingenieurkonsulent DDipl.-Ing. Stefan Oberndorfer

Entrepreneur

Felbermayr Bau GmbH & Co KG, Abt. FST, Niederlassung Lienz

Objet protégé

Infrastructure touristique

Protection anticorrosion

galvanisé, GEOBRUGG SUPERCOATING

Votre contact local

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / Etats-Unis Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Etats-Unis

E-mail

John Kalejta
 

John Kalejta

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,KS 67226 Wichita / Etats-Unis

E-mail

Bob Lyne
 

Bob Lyne

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / Etats-Unis

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Risques naturels
Geobrugg North America, LLC,OR 97302 Salem / Etats-Unis

E-mail