Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg)

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

Short set made up of two edge nets. In the background on the left, you can see the Grünsee mid-station at 1,742 m above sea level. The ropeway then continues to Rudolfshütte at 2,315 m above sea level.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

Overview of the project area with the potential starting zones and the ropeway line to be protected. The double supports are most at risk. They are to be protected against any flowing avalanches that may occur by an additional diversion dam made of natural stone.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The existing wooden avalanche guards have been severely damaged due to frequent rockfalls and weathering. They not longer guarantee the protection required and are therefore being removed.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The avalanche nets from the SPIDER® Avalanche system have not just proven their capabilities as an ideal avalanche construction – they have also been successfully tested against rockfall. This durability when faced with falling rocks is the key advantage of the Geobrugg system.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The pressure plate forms the ideal foundation for the supports in terrain with a 45° incline and a rocky substrate. It is loosely held in position with two ground ropes anchored on the slope, on leveled terrain measuring around 0.7 m x 0.7 m.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The avalanche nets are fixed to the uphill rope anchor with a retention rope, which is cut to size at the factory, with the corresponding number of loops. The rope anchor used is relatively insusceptible to the rockfalls which happen regularly here.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The SPIDER® net surface is supplied from the factory with a screen-like fixed fine mesh and prevents the snow from penetrating.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

View of the supports to be protected on the Weißsee glacier ropeway.

Ochrona przed lawinami - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

From the gondola, the avalanche nets blend seamlessly into the alpine landscape – they are hardly noticeable.

 

Zastosowane systemy

 

Dlugosc systemu od

8 m - 28 m

 

Rok Instalacji / Montazu

2016

Sytuacja początkowa

Falling rocks and weathering had damaged the previous wooden avalanche protection structure. The original protective function had to be restored. Furthermore, other hazardous areas had to be secured in order to provide better protection for the entire ropeway system.

In the project which was originally submitted, the intention was to construct massive avalanche wedges made of reinforced concrete. These were designed to directly protect double supports 21a and 21b, as well as support 22. On account of the enormous dimensions of this structure, the associated costs, and the considerable impact on the landscape – in a conservation area on the edge of the Hohe Tauern National Park, a new protection project was created.

Opis zastosowanego rozwiazania

The new protection concept combines three elements:
•    permanent protection against avalanches through an avalanche protection structure       made of snow nets
•    temporary protection against avalanches through avalanche blasting in conjunction with
•    an avalanche diversion dam to protect objects

Overall, eight sets of SPIDER® Avalanche snow nets with a total length of 140 meters are being erected in three potential avalanche starting zones. With this measure, it is only necessary to construct a 35-meter-long and approximately 3-meter-high dam made of locally acquired, heavy rubble.

With the hardly visible snow nets and natural dam, the authorities were extremely satisfied in terms of conservation of nature and the landscape.

Kraj / Region

Austria

Inwestor

Weißsee Gletscherwelt GmbH

Projektant

Ingenieurkonsulent DDipl.-Ing. Stefan Oberndorfer

Wykonawca

Felbermayr Bau GmbH & Co KG, Abt. FST, Niederlassung Lienz

Chroniony Objekt

Touristic infrastructure

Ochrona przeciwerozyjna

Galvanized, GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria

Formularz kontaktowy