Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Tumbak Bayuh Temple, Bali 2017

The picturesque temple is situated next to a little stream in the center of Bali.

Stabilisation des pentes - Tumbak Bayuh Temple, Bali 2017

The TECCO® high tensile steel wire mesh is tensioned via the spike plates onto the slope.

Stabilisation des pentes - Tumbak Bayuh Temple, Bali 2017

The green carpet behind the high tensile steel wire mesh ensures that the historical and beautiful nature of the place is preserved.

 

Systèmes

 

Année d’installation

2017

Situation de départ

The picturesque temple Tumbak Bayuh lies in the center of Bali. In recent years falling rocks and unstable slopes out of the steep surrounding slopes have endangered this famous worshipping area.

Géologie

Limestone

Description

After a detailed investigation, the unstable slope was stabilized with TECCO® System. The solution was combined with a green carpet revegetation mattress installed between the unstable rock and the high tensile steel wire mesh to blend with the astonishing beautiful surroundings.

By today, we can proudly announce that the temple and its surroundings are safe again.


 

Pays / Région

Indonésie

Client

PU Bali

Entrepreneur

Pt. Amavi

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Country Manager Eastern and Central Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Country Manager Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Country Manager Southern Switzerland

E-mail