Suíça
Suíça

myGeobrugg

Estabilização de taludes - Tumbak Bayuh Temple, Bali 2017

The picturesque temple is situated next to a little stream in the center of Bali.

Estabilização de taludes - Tumbak Bayuh Temple, Bali 2017

The TECCO® high tensile steel wire mesh is tensioned via the spike plates onto the slope.

Estabilização de taludes - Tumbak Bayuh Temple, Bali 2017

The green carpet behind the high tensile steel wire mesh ensures that the historical and beautiful nature of the place is preserved.

 
 

Ano de instalação

2017

Situação inicial

The picturesque temple Tumbak Bayuh lies in the center of Bali. In recent years falling rocks and unstable slopes out of the steep surrounding slopes have endangered this famous worshipping area.

Geologia

Limestone

Descrição

After a detailed investigation, the unstable slope was stabilized with TECCO® System. The solution was combined with a green carpet revegetation mattress installed between the unstable rock and the high tensile steel wire mesh to blend with the astonishing beautiful surroundings.

By today, we can proudly announce that the temple and its surroundings are safe again.


 

País / Região

Indonésia

Promotor

PU Bali

Contratante

Pt. Amavi

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Riscos naturais
Engenharia Hidráulica
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça , Msc. Env. Eng.

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail