瑞士
瑞士

myGeobrugg

Tumbak Bayuh Temple, Bali

边坡稳定 - Tumbak Bayuh Temple, Bali 2017

The picturesque temple is situated next to a little stream in the center of Bali.

边坡稳定 - Tumbak Bayuh Temple, Bali 2017

The TECCO® high tensile steel wire mesh is tensioned via the spike plates onto the slope.

边坡稳定 - Tumbak Bayuh Temple, Bali 2017

The green carpet behind the high tensile steel wire mesh ensures that the historical and beautiful nature of the place is preserved.

 
 

安装年份

2017

情况

The picturesque temple Tumbak Bayuh lies in the center of Bali. In recent years falling rocks and unstable slopes out of the steep surrounding slopes have endangered this famous worshipping area.

地質學

Limestone

描述

After a detailed investigation, the unstable slope was stabilized with TECCO® System. The solution was combined with a green carpet revegetation mattress installed between the unstable rock and the high tensile steel wire mesh to blend with the astonishing beautiful surroundings.

By today, we can proudly announce that the temple and its surroundings are safe again.


 

客户

PU Bali

承包商

Pt. Amavi

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址