Protection contre les chutes de pierres - Gföller Brücke, Val d’Ega 2014

Overview over the Gföller-Bridge with extra latticework, the ROCKFALL-X G system on top and the rockface in the background

Protection contre les chutes de pierres - Gföller Brücke, Val d’Ega 2014

Moving of the ROCKFALL-X G damping modules using a crane

Protection contre les chutes de pierres - Gföller Brücke, Val d’Ega 2014

Bags of various heights of 1.0 m, 1.5 m and 2.0 m during installation - visible height dependent arrangement

Protection contre les chutes de pierres - Gföller Brücke, Val d’Ega 2014

Eventual empty spaces are fiiled with cellular glass in order to prevent any unnecessary movements

Protection contre les chutes de pierres - Gföller Brücke, Val d’Ega 2014

A layer of topsoil, with a lining of erosion-resistant jute sheet, was installed over the ROCKFALL-X G damping modules and then hydroseeded. Visible final solution appearance

 

Systèmes

 

Longueur du système

20 m - 40 m

 

Année d’installation

2014

Situation de départ

The gallery between two stretches of tunnels is exposed to rockfall. The concrete deck risked to be damaged by severe events.

Description

To secure the bridge from rockfall energies up to 2300 kJ, a gallery roof construction was built above the street-stretch between the two tunnels. To reduce the risk further, the gallery-roof was secured by the ROCKFALL-X G damping system. A protection system which works by absorbing kinetic energy, thereby limiting deformation and above all limiting the pressure exerted on the deck by spreading loads over a wide area, while limiting the weight on the gallery so as not to overburden it.

556 preassembled ROCKFALL-X G big bags were delivered and installed during May and June 2014 in the following configuration:

  • 109 pcs. - 1.0 m high
  • 99 pcs. - 1.5 m high
  • 348 pcs - 2.0 m high

Client

Provinz Bozen

Ingénierie

PPS Group, Bozen

Entrepreneur

Max Bögl

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / Etats-Unis Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Etats-Unis

E-mail

John Kalejta
 

John Kalejta

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,KS 67226 Wichita / Etats-Unis

E-mail

Bob Lyne
 

Bob Lyne

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / Etats-Unis

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Risques naturels
Geobrugg North America, LLC,OR 97302 Salem / Etats-Unis

E-mail