Suiza
Suiza

Gamsgrubenweg, Grossglockner

Grossglockner, Austria
2013
Cliente
Grossglockner Hochalpenstrassen AG
Ingeniería
Ingenieurbüro Tschernutter Consulting GmbH
Subcontratista
Felbermayr Bau GmbH
Objeto protegido
Carretera
Capacidad de absorción de energía
1000 kJ
Altura del sistema
1.0 m, 1.5 m
Protección contra la corrosión
GEOBRUGG SUPERCOATING
Situación inicial

To protect from rockfall on an alpine trail at the mountain Grossglockner in Austria, a new rockfall gallery was built between two tunnels.

Descripción

The damping system ROCKFALL-X G was used on top of the gallery to economically dampen rockfall impacts with a calculated energy of up to 800 kJ. For this purpose 85 bags of the 1.3 m high damping modules were prepared in Geobrugg factory and delivered directly to the construction site.

Su contacto local

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Protección contra riesgos naturales, Coastal Erosion Protection, Minería / Túneles
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suiza
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Protección contra riesgos naturales, Minería / Túneles
Geobrugg AG
Industriestrasse 21
5200 Brugg / Suiza
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Protección contra riesgos naturales, Minería / Túneles
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Suiza