Svizzera
Svizzera

Gamsgrubenweg, Grossglockner

Grossglockner, Austria
2013
Cliente
Grossglockner Hochalpenstrassen AG
Progettazione:
Ingenieurbüro Tschernutter Consulting GmbH
Contraente:
Felbermayr Bau GmbH
Oggetto protetto
Strada
Capacità di assorbimento dell'energia:
1000 kJ
Altezza del sistema
1.0 m, 1.5 m
Protezione dalla corrosione
GEOBRUGG SUPERCOATING
Situazione iniziale

To protect from rockfall on an alpine trail at the mountain Grossglockner in Austria, a new rockfall gallery was built between two tunnels.

Descrizione

The damping system ROCKFALL-X G was used on top of the gallery to economically dampen rockfall impacts with a calculated energy of up to 800 kJ. For this purpose 85 bags of the 1.3 m high damping modules were prepared in Geobrugg factory and delivered directly to the construction site.

Il contatto locale

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Sistemi contro il dissesto idrogeologico, Protezione delle coste e regimentazione dei corsi d’acqua, Miniera / Gallerie
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Svizzera
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Sistemi contro il dissesto idrogeologico, Miniera / Gallerie
Geobrugg AG
Industriestrasse 21
5200 Brugg / Svizzera
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Sistemi contro il dissesto idrogeologico, Miniera / Gallerie
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Svizzera