Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.
With a feasibility study we have proven the effectiveness of a protection system within a building (SMP Ingenieure im Bauwesen GmbH in Karlsruhe).
Stahlbau Schauenberg GmbH - supported by one of our assembly instructors - installed the system in the production hall.
During the installation of the nets, ropes and brake elements supplied by Geobrugg, our assembly technician supervised the assembly.
Dimensions
Phone | +41 71 466 81 98 |