Protección contra impactos - Production hall protection system 2019

Completely installed safety net still with the yellow installation straps

Protección contra impactos - Production hall protection system 2019

Before installing the safety net: the hall is open up to the ridge and the glass skylights; the suspended ceiling has no protective functions

Protección contra impactos - Production hall protection system 2019

Laterally fixed steel bars for fastening the safety net with the brakes

Protección contra impactos - Production hall protection system 2019

Delivery of the mesh rolls

Protección contra impactos - Production hall protection system 2019

Close-up: 2 of 160 brake boxes

Protección contra impactos - Production hall protection system 2019

The high-tensile steel wire mesh was rolled out using assembly belts. The panels were then connected with a seam rope.

Protección contra impactos - Production hall protection system 2019

The wire mesh allows the light to pass and protects the employees

 

Año de instalación

2019

Situación inicial

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Descripción

With a feasibility study we have proven the effectiveness of a protection system within a building (SMP Ingenieure im Bauwesen GmbH in Karlsruhe).

Stahlbau Schauenberg GmbH - supported by one of our assembly instructors - installed the system in the production hall.

During the installation of the nets, ropes and brake elements supplied by Geobrugg, our assembly technician supervised the assembly.

Dimensions

  •     6.5 meters wide
  •     80 meters long

País / Región

Alemania

Cliente

n.a.

Ingeniería

Geobrugg

Subcontratista

Stahlbau Schauenberg GmbH

Otras empresas participantes

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Objeto protegido

Edificio, Infraestructura

Su contacto local

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Protección contra riesgos naturales
Protección contra impactos
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / EE. UU. Regional Manager California

Correo electrónico

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Protección contra riesgos naturales
Protección contra impactos
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

Correo electrónico

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Protección contra riesgos naturales
Protección contra impactos
Geobrugg North America, LLC,KS 67226 Wichita / EE. UU. Regional Manager Rocky Mountains / Central USA

Correo electrónico

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Protección contra riesgos naturales
Protección contra impactos
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / EE. UU. Regional Sales Manager Southeast

Correo electrónico

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Protección contra riesgos naturales
Protección contra impactos
Geobrugg North America, LLC,OR 97302 Salem / EE. UU. Regional Sales Manager Pacific Northwest and Hawaii

Correo electrónico