Production hall protection system

Protezione dagli impatti - Production hall protection system 2019

Completely installed safety net still with the yellow installation straps

Protezione dagli impatti - Production hall protection system 2019

Before installing the safety net: the hall is open up to the ridge and the glass skylights; the suspended ceiling has no protective functions

Protezione dagli impatti - Production hall protection system 2019

Laterally fixed steel bars for fastening the safety net with the brakes

Protezione dagli impatti - Production hall protection system 2019

Delivery of the mesh rolls

Protezione dagli impatti - Production hall protection system 2019

Close-up: 2 of 160 brake boxes

Protezione dagli impatti - Production hall protection system 2019

The high-tensile steel wire mesh was rolled out using assembly belts. The panels were then connected with a seam rope.

Protezione dagli impatti - Production hall protection system 2019

The wire mesh allows the light to pass and protects the employees

 

Anno di installazione

2019

Situazione iniziale

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Descrizione

With a feasibility study we have proven the effectiveness of a protection system within a building (SMP Ingenieure im Bauwesen GmbH in Karlsruhe).

Stahlbau Schauenberg GmbH - supported by one of our assembly instructors - installed the system in the production hall.

During the installation of the nets, ropes and brake elements supplied by Geobrugg, our assembly technician supervised the assembly.

Dimensions

  •     6.5 meters wide
  •     80 meters long

Paese / Regione

Germania

Cliente

n.a.

Progettazione:

Geobrugg

Contraente:

Stahlbau Schauenberg GmbH

Altre società partecipanti

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Oggetto protetto

Costruzione, Infrastrutture

Il contatto locale

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Stati Uniti Regional Manager California

E-mail

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

E-mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,KS 67226 Wichita / Stati Uniti Regional Manager Rocky Mountains / Central USA

E-mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / Stati Uniti Regional Sales Manager Southeast

E-mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,OR 97302 Salem / Stati Uniti Regional Sales Manager Pacific Northwest and Hawaii

E-mail