Укрепление склонов - Laúca Hydro Power Plant 2017

Overview project site: Visible are the 600 meters long rockfall barrier RXI-050 and the slopes above partially covered with TECCO® SYSTEM³

Укрепление склонов - Laúca Hydro Power Plant 2017

Top of the slope having the form of a cliff consisting tower structures

Укрепление склонов - Laúca Hydro Power Plant 2017

Complicated self-drilling nails INCO 32 TD type installation. All works required rope access

Укрепление склонов - Laúca Hydro Power Plant 2017

TECCO³ SYSTEM³ during installation works: drilling rig at the nearly vertical rockface with spike plates not yet tightened

Укрепление склонов - Laúca Hydro Power Plant 2017

Installation of TECCO® SYSTEM³ on top of the slope having the form of a cliff

Укрепление склонов - Laúca Hydro Power Plant 2017

Top of the slope stabilization with high tensile mesh TECCO® G65/3 and self-drilling nails INCO 32 TD

Укрепление склонов - Laúca Hydro Power Plant 2017

TECCO® SYSTEM³ during installation: visible unrolling of the high tensile TECCO® G65/3 mesh on the slope

Укрепление склонов - Laúca Hydro Power Plant 2017

Overview of the Laúca Hydro Power Plant construction site from above the RXI-050 rockfall barrier line

Укрепление склонов - Laúca Hydro Power Plant 2017

TECCO® SYSTEM³ during installation: visible scale of the project

Укрепление склонов - Laúca Hydro Power Plant 2017

RXI-050 rockfall barrier during installation: slope above is already protected with TECCO® SYSTEM³

Укрепление склонов - Laúca Hydro Power Plant 2017

ROCCO® high tensile net fastening being a part of the rockfall barrier RXI-050

Укрепление склонов - Laúca Hydro Power Plant 2017

Fully installed RXI-050 rockfall barrier. Slope above and below the barrier line is stabilized with the TECCO® SYSTEM³

Укрепление склонов - Laúca Hydro Power Plant 2017

Overview of the installation site: visible geomorphology of the whole slope

Укрепление склонов - Laúca Hydro Power Plant 2017

Aerial view of the construction site with a perfect overview of the rockfall barrier RXI-050 lines

 

Системы

 

Год установки

2017

Ситуация

The Lauca Hydro Power Plant is located at the foot of a steep slope.  The slope requires stabilization to avoid causing damage to the facilities and equipment.

Rеология

Project site consists of the following types of rock:

  • colluvium
  • silicified sandstone
  • porous sandstone
  • sandstone-siltstone transition
  • siltstone
  • gneiss from moderately fractured to strongly altered

Описание

The following solutions were used for slope protection:

Top of the cliffs and tower shaped structures partially protected with TECCO® System:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 1.4 x 1.4 m

Tower shaped structures partially protected with TECCO® System and SPIDER® System:

  • high tensile mesh: TECCO® G65/3
  • high tensile net SPIDER S4-230
  • tower structure width below 3.0 m: nail pattern 1.4 x 1.4 m
  • tower structure width over 3.0 m: nail pattern 3.0 x 1.4 m

At the base of the tower structures:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 5.0 x 5.0 m

Regular area of the slope, between rockfall barrier line and top of the cliffs:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 5.0 x 5.0 m

Below the rockfall barrier, ca. 10 m high zone directly above slope cut:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 8.0 m
  • nail pattern: 2.0 x 2.0 m

Self drilling nails were used due to  fractured condition of the  rock slope.

Passive rockfall protection barrier:

  • rockfall protection barrier RXI-050
  • height: 4 m
  • length: 600 m in 3 sections of: 180 m / 240 m / 180 m

 

Страна / Регион

Ангола

Клиент

Aproveitamento Hidroeléctrico de Laúca

Проектировщик

Intertechne Consultores S.A.

Dahil olan diğer şirketler

Tecnasol Fundações E Geotecnia, S.A.

Защищаемый объект

Дорога, Строительство, Инфраструктура, Другое

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

Kevin Coyle
 

Kevin Coyle

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / США

Электронная почта

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
безопасность
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / США Regional Manager California

Электронная почта

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Инженерная защита
безопасность
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Инженерная защита
безопасность
Geobrugg North America, LLC,KS 67226 Wichita / США Regional Manager Rocky Mountains / Central USA

Электронная почта

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Инженерная защита
безопасность
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / США Regional Sales Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Инженерная защита
безопасность
Geobrugg North America, LLC,OR 97302 Salem / США Regional Sales Manager Pacific Northwest and Hawaii

Электронная почта