비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Overview project site: Visible are the 600 meters long rockfall barrier RXI-050 and the slopes above partially covered with TECCO® SYSTEM³

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Top of the slope having the form of a cliff consisting tower structures

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Complicated self-drilling nails INCO 32 TD type installation. All works required rope access

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

TECCO³ SYSTEM³ during installation works: drilling rig at the nearly vertical rockface with spike plates not yet tightened

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Installation of TECCO® SYSTEM³ on top of the slope having the form of a cliff

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Top of the slope stabilization with high tensile mesh TECCO® G65/3 and self-drilling nails INCO 32 TD

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

TECCO® SYSTEM³ during installation: visible unrolling of the high tensile TECCO® G65/3 mesh on the slope

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Overview of the Laúca Hydro Power Plant construction site from above the RXI-050 rockfall barrier line

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

TECCO® SYSTEM³ during installation: visible scale of the project

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

RXI-050 rockfall barrier during installation: slope above is already protected with TECCO® SYSTEM³

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

ROCCO® high tensile net fastening being a part of the rockfall barrier RXI-050

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Fully installed RXI-050 rockfall barrier. Slope above and below the barrier line is stabilized with the TECCO® SYSTEM³

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Overview of the installation site: visible geomorphology of the whole slope

비탈면 보강 시스템 - Laúca Hydro Power Plant 2017

Aerial view of the construction site with a perfect overview of the rockfall barrier RXI-050 lines

 
 

설치 년도

2017

Situation

The Lauca Hydro Power Plant is located at the foot of a steep slope.  The slope requires stabilization to avoid causing damage to the facilities and equipment.

Geology

Project site consists of the following types of rock:

  • colluvium
  • silicified sandstone
  • porous sandstone
  • sandstone-siltstone transition
  • siltstone
  • gneiss from moderately fractured to strongly altered

Description

The following solutions were used for slope protection:

Top of the cliffs and tower shaped structures partially protected with TECCO® System:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 1.4 x 1.4 m

Tower shaped structures partially protected with TECCO® System and SPIDER® System:

  • high tensile mesh: TECCO® G65/3
  • high tensile net SPIDER S4-230
  • tower structure width below 3.0 m: nail pattern 1.4 x 1.4 m
  • tower structure width over 3.0 m: nail pattern 3.0 x 1.4 m

At the base of the tower structures:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 5.0 x 5.0 m

Regular area of the slope, between rockfall barrier line and top of the cliffs:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 5.0 x 5.0 m

Below the rockfall barrier, ca. 10 m high zone directly above slope cut:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 8.0 m
  • nail pattern: 2.0 x 2.0 m

Self drilling nails were used due to  fractured condition of the  rock slope.

Passive rockfall protection barrier:

  • rockfall protection barrier RXI-050
  • height: 4 m
  • length: 600 m in 3 sections of: 180 m / 240 m / 180 m

 

Country/Region

앙골라

Customer

Aproveitamento Hidroeléctrico de Laúca

Engineering

Intertechne Consultores S.A.

Subcontractor

Tecnasol Fundações E Geotecnia, S.A.

Protected object

Road, Building, Infrastructure, Other

부식방지

GEOBRUGG SUPERCOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi, Regional Manager California
 

Saleh Feidi

자연 재해
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국 , Regional Manager California

이메일

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

자연 재해
Geobrugg North America, LLC,KS 67226 Wichita / 미국 Regional Manager Rocky Mountains / Central USA

이메일

Bob Lyne
 

Bob Lyne

Regional Sales Manager Southeast

자연 재해
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국 Regional Sales Manager Southeast

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

이메일

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국 Regional Sales Manager Pacific Northwest and Hawaii

이메일