スイス
スイス

myGeobrugg

 - Sha Tin Hospital 2013

The RXE-5000 rockfall barrier in an urban area

 - Sha Tin Hospital 2013

Barrier and protected infrastructure

 - Sha Tin Hospital 2013

The barrier has a total length of 232 meters

 - Sha Tin Hospital 2013

Due to the specific terrain, the barrier required special solutions - e.g. a downslope retaining rope where the barrier is turning slightly upslope

 - Sha Tin Hospital 2013

The barrier is 6 meters high

 

システム

 

システム延長

- 232 m

 

設置年

2013

状況

The area next to the hospital in Sha Tin town required a rockfall barrier as part of a Landslip Prevention and Mitigation Program, allowing further residential development.

説明

A RXE-5000A rockfall barrier was installed.

顧客名

Civil Engineering and Development Department

落札者

Fong On Geotechnics Ltd.

保護対象

建築, 居住区

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

エンジニアリング

Marshall-Karson Construction & Engineers Ltd.

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム