瑞士
瑞士

myGeobrugg

落石防护 - Sha Tin Hospital 2013

The RXE-5000 rockfall barrier in an urban area

落石防护 - Sha Tin Hospital 2013

Barrier and protected infrastructure

落石防护 - Sha Tin Hospital 2013

The barrier has a total length of 232 meters

落石防护 - Sha Tin Hospital 2013

Due to the specific terrain, the barrier required special solutions - e.g. a downslope retaining rope where the barrier is turning slightly upslope

落石防护 - Sha Tin Hospital 2013

The barrier is 6 meters high

 

系统

 

系统长度

- 232 m

 

安装年份

2013

情况

The area next to the hospital in Sha Tin town required a rockfall barrier as part of a Landslip Prevention and Mitigation Program, allowing further residential development.

描述

A RXE-5000A rockfall barrier was installed.

客户

Civil Engineering and Development Department

承包商

Fong On Geotechnics Ltd.

防护对象

Building, Residential area

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

工程

Marshall-Karson Construction & Engineers Ltd.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址