スイス
スイス

myGeobrugg

 - Industrial Road km 21 2023

General view of the rock fall barrier installed

 - Industrial Road km 21 2023

Drilling process of the retention anchors

 - Industrial Road km 21 2023

Installation of the post on top of the base plate

 - Industrial Road km 21 2023

View of all the post installed

 - Industrial Road km 21 2023

ROCCO ring net down slope

 - Industrial Road km 21 2023

ROCCO ring net taken down slope of the barrier

 - Industrial Road km 21 2023

Side view of the installed barrier

 

システム

 

システム延長

- 60 m

 

設置年

2023

状況

The channel that transports copper concentrate was exposed to possible rockfalls from a farellon. The breakage of this infrastructure would have great economic and environmental consequences. To mitigate this problem, a project that includes a rock fall barrier was developed. 

説明

In order to protect this critical infrastructure, a dynamic barrier with a capacity of  3,000 kJ of energy absorption, 7 meters high and 60 meters long was installed.

顧客名

エンジニアリング

保護対象

鉱山/採石場

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム