瑞士
瑞士

myGeobrugg

落石防护 - Industrial Road km 21 2023

General view of the rock fall barrier installed

落石防护 - Industrial Road km 21 2023

Drilling process of the retention anchors

落石防护 - Industrial Road km 21 2023

Installation of the post on top of the base plate

落石防护 - Industrial Road km 21 2023

View of all the post installed

落石防护 - Industrial Road km 21 2023

ROCCO ring net down slope

落石防护 - Industrial Road km 21 2023

ROCCO ring net taken down slope of the barrier

落石防护 - Industrial Road km 21 2023

Side view of the installed barrier

 

系统

 

系统长度

- 60 m

 

安装年份

2023

情况

The channel that transports copper concentrate was exposed to possible rockfalls from a farellon. The breakage of this infrastructure would have great economic and environmental consequences. To mitigate this problem, a project that includes a rock fall barrier was developed. 

描述

In order to protect this critical infrastructure, a dynamic barrier with a capacity of  3,000 kJ of energy absorption, 7 meters high and 60 meters long was installed.

国家/地区

智利

客户

工程

防护对象

Mine / Quarry

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士

联系地址