 - Hydropowerplant Chile II 2016

MINAX® reinforcement

 - Hydropowerplant Chile II 2016

Two MESHA® working at the same time

 - Hydropowerplant Chile II 2016

MESHA® dispositive working

 - Hydropowerplant Chile II 2016

MESHA® installing MINAX® rock mesh

 

設置年

2016

状況

The Alto Maipo project consists of a hydroelectric plant which includes five high mountain intakes, 70 kilometers of tunnels at an average depth of 800 meters, two cavern power plants - Alfalfal II and Las Lajas- with a combined capacity of 531 MW and 17 kilometers of high voltage lines.

The relevant civil works consider 70 kilometers of tunnels excavated in solid rock, at an average depth of 800 meters. Its size is defined by the flow rate to be transported and the minimum dimensions required for the operation of the excavation machinery. The tunnels will conduct the water under pressure and at low speed, losing very little energy until it reaches the machine caverns.

Due to the mountain range area rock bursting problems have been registered. The require fortification in order to protect both human lives and the machinery necessary for the development of a tunnel.

説明

For safety reasons MINAX® 80/4  rock mesh have been implemented: In order to provide the necessary energy absorption capacity in case of rock bursting that could occur due to the geological conditions of the tunnels of the Alto Maipo project.

At the same time, in order to optimize the fortification operation and safeguard the integrity of the workers, the MESHA® device has been implemented. The nailing is carried out fully mechanized.

国名

チリ

顧客名

AES GENER

保護対象

鉱山/採石場, その他

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Project Manager Sales Eastern Switzerland

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム