スイス
スイス

myGeobrugg

 - Cartagena Viaduct 2023

Rock block separating the bridge - stabilized with steel-wire mesh and spike plates

 - Cartagena Viaduct 2023

SPIDER® S3-130 mesh and spike plates

 - Cartagena Viaduct 2023

Re-vegetation at the foot of the rock

 

システム

 

設置年

2023

状況

The G-94-F highway links Cartagena with other cities on the central coast of Chile. The highway passes an over 40-meter-high bridge. A rock separates the two lanes of the bridge. This large rock fractured, and the gap began to expand, threatening the infrastructure and, thus, the connection between the cities.

The company GESVIAL is responsible for keeping the rock stable and the road safe by installing a stabilization system to stop the expansion of the opening.

説明

Today, the SPIDER® S3-130 system is stabilizing the rock. 
The rock’s volume is 18 cubic meters and weighs about 50 tons. It appears stable and sound, with a 10 mm crack opening and an inclination angle of 45°. The rock has not shown movements.

The system was installed with drilling anchors, spike plates, cable anchors, steel cables, and connection accessories.

国名

チリ

顧客名

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Project Manager Sales Eastern Switzerland

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
モニタリングサービス
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム