スイス
スイス

myGeobrugg

ロードセーフティバリア - Bodenberg B21 2020

Fully installed system, protection for both parties

ロードセーフティバリア - Bodenberg B21 2020

Installation of NORDBETON concrete barriers with reflectors

ロードセーフティバリア - Bodenberg B21 2020

Panels arriving in panel rack; note the NORDBETON transition end element for road safety

ロードセーフティバリア - Bodenberg B21 2020

Use of crane to install panels

ロードセーフティバリア - Bodenberg B21 2020

Originally developed for motorsports, installed with accordance to FIA 3502-2018

ロードセーフティバリア - Bodenberg B21 2020

Completely installed, mobile, temporary rockfall protection fence

ロードセーフティバリア - Bodenberg B21 2020

Roadfence as a temporary rockfall protection

 

システム延長

60 m

 

設置年

2020

状況

Scaling activities must take place at Bodenberg B21. In order to keep the road open, the road authorities had to select a system that protects both traffic from the falling rock and the road workers from the traffic. They required that the system is robust and quickly deployable.

説明

The solution: 60 meters of homologated mobile debris fence (mDF350-2) while keeping one lane of the road open within two weeks of order. The installation took 4 hours to complete. It allows for the road to remain open during the entire works.

国名

ドイツ

落札者

保護対象

道路, インフラ, その他

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム