道路护栏 - Bodenberg B21 2020

Fully installed system, protection for both parties

道路护栏 - Bodenberg B21 2020

Installation of NORDBETON concrete barriers with reflectors

道路护栏 - Bodenberg B21 2020

Panels arriving in panel rack; note the NORDBETON transition end element for road safety

道路护栏 - Bodenberg B21 2020

Use of crane to install panels

道路护栏 - Bodenberg B21 2020

Originally developed for motorsports, installed with accordance to FIA 3502-2018

道路护栏 - Bodenberg B21 2020

Completely installed, mobile, temporary rockfall protection fence

道路护栏 - Bodenberg B21 2020

Roadfence as a temporary rockfall protection

 

系统长度

60 m

 

安装年份

2020

情况

Scaling activities must take place at Bodenberg B21. In order to keep the road open, the road authorities had to select a system that protects both traffic from the falling rock and the road workers from the traffic. They required that the system is robust and quickly deployable.

描述

The solution: 60 meters of homologated mobile debris fence (mDF350-2) while keeping one lane of the road open within two weeks of order. The installation took 4 hours to complete. It allows for the road to remain open during the entire works.

承包商

防护对象

Road, Infrastructure, Other

本地联系方式

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士

联系地址