スイス
スイス

myGeobrugg

Bassin d'Antiquailles - Tranchée rocheuse

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Stabilization of the rock face with the TECCO G65/3 system

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Anchors positioned in the cavities ensure proper tensioning of the mesh

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Transition between the concrete frame and the stabilized slope

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

The mesh adapts to different ground profiles, here rocky and loose areas

 

システム

 

設置年

2022

状況

In case of a big flood in the region, a trench was planned to allow the transfer of water to temporary storage (quarry).
The trench is partly equipped with a reinforced concrete framework, while a linear of about 60 meters remains in the open air and must be reinforced to avoid landslides

地質

Calcaire

説明

The exposed rock face has fractured planes that can generate local instability. TECCO system, consisting of a G65/3 mesh associated with a P33 spike plate, was selected.
The resistance of the TECCO G65/3 mesh allowed us to propose a flexible-facing solution adapted to the site.

顧客名

エンジニアリング

落札者

保護対象

インフラ

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム