瑞士
瑞士

myGeobrugg

Bassin d'Antiquailles - Tranchée rocheuse

边坡稳定 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Stabilization of the rock face with the TECCO G65/3 system

边坡稳定 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Anchors positioned in the cavities ensure proper tensioning of the mesh

边坡稳定 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Transition between the concrete frame and the stabilized slope

边坡稳定 - Bassin d'Antiquailles - Tranchée rocheuse 2022

The mesh adapts to different ground profiles, here rocky and loose areas

 
 

安装年份

2022

情况

In case of a big flood in the region, a trench was planned to allow the transfer of water to temporary storage (quarry).
The trench is partly equipped with a reinforced concrete framework, while a linear of about 60 meters remains in the open air and must be reinforced to avoid landslides

地質學

Calcaire

描述

The exposed rock face has fractured planes that can generate local instability. TECCO system, consisting of a G65/3 mesh associated with a P33 spike plate, was selected.
The resistance of the TECCO G65/3 mesh allowed us to propose a flexible-facing solution adapted to the site.

承包商

防护对象

Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士

联系地址