アメリカ合衆国
アメリカ合衆国

myGeobrugg

モータースポーツ デブリフェンス - Baku City Circuit 2024

Back-to-back installation of mobile debris fence

モータースポーツ デブリフェンス - Baku City Circuit 2024

T16 - protection of spectator grandstand

モータースポーツ デブリフェンス - Baku City Circuit 2024

The back-to-back solution was replacing the original solution, which required asphalt works before and after the installation

モータースポーツ デブリフェンス - Baku City Circuit 2024

Runoff T1 - protection of camera position

 

システム延長

1000 m

 

設置年

2024

状況

In 2016, the Baku City Circuit hosted the European Grand Prix for the first time. Since then, the race in Azerbaijan’s capital has been part of the Formula 1 racing calendar.

With over six kilometers, the temporary street circuit is one of the longest tracks on the current Formula 1 racing calendar.

As a standard, City Circuits are installed for the event and dismantled after the event. The installation and dismantling process might lead to disruption in traffic and daily life of the local residents which needs to be minimized as much as possible.

Baku City Circuit contacted Geobrugg in early 2024 to request replacing the existing solution, with the aim of reducing traffic disruption and increasing installation speed. 

説明

Together with Baku City Circuit Geobrugg Motorsport, the best solution for the different areas of concern was evaluated. At Neftchilar Ave, a special double-sided barrier has been used. It required annual asphalt work before installation and after removal. The difficult installation process led to massive traffic disruption, which must be minimized.

Geobrugg proposed their mobile debris fence (mDF350-3) in a back-to-back configuration. The concrete barriers will be placed on the asphalt, eliminating the need for asphalt works. In addition, the client preinstalled the debris fence panels on the concrete barrier for installation.

The installation of around 1 kilometer of barriers and debris fence was completed within two days, and the entire system was removed in just one day. The client and the city authorities are very pleased, as all goals have been achieved.

国名

アゼルバイジャン

顧客名

エンジニアリング

担当者の連絡先

Marty Hunt
   

Marty Hunt

Sales & Project Manager Motorsport

モータースポーツ
Geobrugg Partner - Motorsport Logistics & Technology L.L.C.,PO Box 138,IN 46167 USA Pittsboro / アメリカ合衆国 Sales & Project Manager Motorsport

お問い合わせフォーム