Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Tidong power plant with protection installations from the distance

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Drilling operation at site

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Challenging site condition - works exactly above the powerhouse

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® protective mesh

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® and QUAROX® protective mesh

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of the ringnet rockfall barrier, which, together with the mesh, protects the infrastructure.

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of RXE-500 rockfall barrier

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

30 meters of 500 kJ rockfall barrier installed to protect SST-UAT area

Protection contre les chutes de pierres - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

RXE rockfall protection barriers offer maximum safety in the tightest of spaces

 

Longueur du système

30 m

 

Année d’installation

2024

Situation de départ

The project location in Himachal Pradesh, India, lies approximately 40 kilometers east of Kalpa. In 2019, the powerhouse below the cliff was still under construction. By 2024, however, it was fully operational, with sophisticated equipment installed within and on top. Ensuring the prevention of rockfalls during slope stabilization work was critical, as the area was narrower compared to previous work. Dead trees on the vertical edges of the cliff added to the project’s complexity, requiring careful negotiation. Design and technological modifications were necessary at every step. Rockfalls have been observed in the SST-UAT area of the powerhouse, prompting the customer to request a barrier solution for this specific location.

Description

The site required a cost-effective protection system to stabilize the problematic slope and safeguard the powerhouse area permanently. The chosen solution needed to address several challenges: an almost vertically unstable slope with limited accessibility, complex geological conditions, and strict installation time constraints. The client entrusted us with the full responsibility for designing, supplying, and installing the solution.

The client relied on the previously installed flexible slope stabilization system, which utilized QUAROX® 0.3/6.5/275 rolled cable net with Geobrugg SUPERCOATING and high tensile rockfall protection netting DELTAX® G80/2 (secondary mesh)—total area 3500 square meters.  The installation included a variable grid pattern and fully grouted rock bolts with a diameter of 32 mm and a length of 3 meters.

Additionally, an RXE-500 rockfall barrier line of 30 meters, with a post height of 4 metes capable of absorbing impact energies up to 500 kJ, was installed in the SST-UAT area to protect both men and machinery. 

Pays / Région

Inde

Client

Statkraft

Objet protégé

Infrastructure

Protection anticorrosion

galvanisé

Votre contact local

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / Etats-Unis Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Etats-Unis

E-mail

John Kalejta
 

John Kalejta

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,KS 67226 Wichita / Etats-Unis

E-mail

Bob Lyne
 

Bob Lyne

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / Etats-Unis

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Risques naturels
Geobrugg North America, LLC,OR 97302 Salem / Etats-Unis

E-mail