Estados Unidos
Estados Unidos

myGeobrugg

Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Tidong power plant with protection installations from the distance

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Drilling operation at site

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Challenging site condition - works exactly above the powerhouse

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® protective mesh

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® and QUAROX® protective mesh

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of the ringnet rockfall barrier, which, together with the mesh, protects the infrastructure.

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of RXE-500 rockfall barrier

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

30 meters of 500 kJ rockfall barrier installed to protect SST-UAT area

Proteção contra desprendimentos - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

RXE rockfall protection barriers offer maximum safety in the tightest of spaces

 
 

Comprimento do sistema

30 m

 

Ano de instalação

2024

Situação inicial

The project location in Himachal Pradesh, India, lies approximately 40 kilometers east of Kalpa. In 2019, the powerhouse below the cliff was still under construction. By 2024, however, it was fully operational, with sophisticated equipment installed within and on top. Ensuring the prevention of rockfalls during slope stabilization work was critical, as the area was narrower compared to previous work. Dead trees on the vertical edges of the cliff added to the project’s complexity, requiring careful negotiation. Design and technological modifications were necessary at every step. Rockfalls have been observed in the SST-UAT area of the powerhouse, prompting the customer to request a barrier solution for this specific location.

Descrição

The site required a cost-effective protection system to stabilize the problematic slope and safeguard the powerhouse area permanently. The chosen solution needed to address several challenges: an almost vertically unstable slope with limited accessibility, complex geological conditions, and strict installation time constraints. The client entrusted us with the full responsibility for designing, supplying, and installing the solution.

The client relied on the previously installed flexible slope stabilization system, which utilized QUAROX® 0.3/6.5/275 rolled cable net with Geobrugg SUPERCOATING and high tensile rockfall protection netting DELTAX® G80/2 (secondary mesh)—total area 3500 square meters.  The installation included a variable grid pattern and fully grouted rock bolts with a diameter of 32 mm and a length of 3 meters.

Additionally, an RXE-500 rockfall barrier line of 30 meters, with a post height of 4 metes capable of absorbing impact energies up to 500 kJ, was installed in the SST-UAT area to protect both men and machinery. 

País / Região

Índia

Promotor

Statkraft

Objecto protegido

Infra-estrutura

Proteção contra a corrosão

Galvanizado

O seu contacto local

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / Estados Unidos Regional Manager Northeast

E-mail

Saleh Feidi, Regional Manager California
 

Saleh Feidi

Riscos naturais
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Estados Unidos , Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Riscos naturais
Geobrugg North America, LLC,KS 67226 Wichita / Estados Unidos Regional Manager Rocky Mountains / Central USA

E-mail

Bob Lyne
 

Bob Lyne

Regional Sales Manager Southeast

Riscos naturais
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / Estados Unidos Regional Sales Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Riscos naturais
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

E-mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Riscos naturais
Geobrugg North America, LLC,OR 97302 Salem / Estados Unidos Regional Sales Manager Pacific Northwest and Hawaii

E-mail