Suisse
Suisse

myGeobrugg

Clôtures routières - Railway Clervaux 2023

Installation of the temporary rock fence protecting the bicycle path between railwayline and rockface.

Clôtures routières - Railway Clervaux 2023

The local services deliver and remove the fence elements with their vehicles.

Clôtures routières - Railway Clervaux 2023

The concrete elements have been placed - ready for the installation of the fence panels. As the system has been invented, tested and installed at urban motorsport races, curvy coures are mastered easily.

Clôtures routières - Railway Clervaux 2023

The municipality's employees setting the fence panels.

 

Longueur du système

380 m

 

Année d’installation

2023

Situation de départ

The Government of Luxembourg is constructing more and more bicycle roads along the railway or using former railway lines as bicycle paths. In Clervaux, the bicycle path leads between the railway line and a rocky slope.

Description

A temporary rockfall protection was necessary before completion of a permanent rockfall protection. A temporary solution, a road fence with concrete elements and fence panels, could be easily installed by the local Road Authorities PCH region Diekirch. They will also deinstall the road fence. Future use for construction sites or events is possible.

Stabilizing the rockface with mesh (TECCO G65/3 and SPIDER) over 500 Meters in eight different zones is planned for autumn 2023.

Client

Ministère du développement durable et des Infrastructures Administration des Ponts et Chaussée, Diekirch

Entrepreneur

Road Authorities PCH region Diekirch (Installation)

Objet protégé

Route/Rue, Chemin de fer, Infrastructure touristique, Zone résidentielle

Autres applications installées

Protection contre les chutes de pierres

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail