A natural stone wall along a country road was reconstructed. The duration of the reconstruction was several months and a complete stoppage of the country road was to be avoided. To enable a partial usage of the road, a road protection with concrete elements was needed. Protection fences (height 2 m) were to be added to the concrete elements to retain potential rocks.
Temporary road protection
Know how from motorsport area
Safety measure to secure traffic from falling rocks