Suisse
Suisse

Clackamas Highway, Oregon, OR224

MP 36.5 OR 224 (Clackamas Highway) Oregon, 97023, Estacada, Oregon
2015
Client
Oregon Department of Transportation
Ingénierie
Oregon Department of Transportation
Entrepreneur
High-Tech Rockfall Construction, Inc.
Objet protégé
Route/Rue
Classe énergétique
N/A
Hauteur du système
3.0 m, 4.0 m, 6.0 m
Longueur du système
393 m
Protection anticorrosion
galvanisé, GEOBRUGG SUPERCOATING
Autres applications installées
Protection contre les chutes de pierres
Situation de départ

The Clackamas Highway (OR 224) is an expressway that passes through hilly farmland to the city of Estacada, OR, continuing southeast into the Mount Hood National Forest, ending to the small community of Ripplebrook. In September of 2014, a wildfire named Pit 36 broke out growing quickly and burning 5500 acres of the steep heavily timbered slopes (The Oregonian 9.15.14). Already near vertical highway rock cuts along OR 224, combined with freshly burned and exposed ground were perfect conditions for high rockslide and landslide potential. 

Not a short two months after the fire two rockslides dumped 350 cubic yards of material across both lanes of Highway 224 near milepost 35 forcing residents and loggers to take a 1-1/2 hour detour (The Oregonian, 11.10.14).  After an emergency clean-up of the rockslides the highway was reopened awaiting permanent rockfall mitigation measures to be implemented. Engineering Geologists from the Oregon Department of Transportation investigated the slopes and evaluated the rockfall hazard for a permanent mitigation strategy.  

Description

Through the design process Geobrugg provided technical support on various flexible rockfall mitigation systems.  The Engineering Geologists from the Oregon Department of Transportation chose to mitigate future rockfall with the use of an Attenuator Hybrid Rockfall Barrier System.  

The Rockfall Impact Attenuator Systems supplied on this project utilizes GBE-500A post and rope infrastructure supporting TECCO® G80/4 [mm] mesh that drapes down to the safe runout zone at the toe of the rock slope. As specified in the projects plans, two attenuator hybrid rockfall barriers were installed as a part of this project.  One system is 300 feet long, with 4 meter tall posts, having an approximately 80 feet long TECCO® mesh draped tail. 

The second system was much longer at 987 feet in length and was customized with three system heights at 4 meters, 6 meters, and again dropping down to 3 meters.  Specialized posts were developed in order to transition between the various system heights in a continuous manner, optimizing post spacing and rope layouts. The draped TECCO® mesh tails on these systems are up to 100 feet long terminating nominally 10 feet above the toe of the slope.

The attenuator hybrid rockfall barrier systems are fully compliant with Buy America requirements for steel being made from steel forged and manufactured in the United States. 

  

Votre contact local

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Natural Hazards, Coastal Erosion Protection, Exploitation minière / Tunnel
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suisse
Téléphone 071 466 81 52
Mobile 078 783 46 81

E-mail

René Müller
René Müller
Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG
Industriestrasse 21
5200 Brugg / Suisse
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Suisse