瑞士
瑞士

myGeobrugg

Stelzentunnel Tunnel Maintenance

道路护栏 - Stelzentunnel Tunnel Maintenance 2017

Stelzentunnel: driving lanes and the construction site area are separated from each other and ensure safety on both sides. In the picture: before extending the panels to the required height

道路护栏 - Stelzentunnel Tunnel Maintenance 2017

Bottom: standard «step» concrete element; top: braced against the ceiling

道路护栏 - Stelzentunnel Tunnel Maintenance 2017

The rapid construction and mobility of the system require only short road closures in the tunnel

道路护栏 - Stelzentunnel Tunnel Maintenance 2017

Fence panels with wooden boards - they protect the traffic from dust and water of the construction works and withstand the airflow of the trucks.

道路护栏 - Stelzentunnel Tunnel Maintenance 2017

Close-up panel with formwork panels

 

系统

Special Solutions Mobile Road Fencing

 

系统长度

400 m

 

安装年份

2017

情况

One of Switzerland's central motorways runs through the Stelzentunnel near Zurich. Since 2017, the Stelzentunnel (1.6 km long) has been renovated in stages.

A mobile protective fence separates the trafficable lanes from the construction site. One of the requirements of this protective fence was that it could be erected quickly so that the motorway only needs to be closed for a few hours.

描述

Geobrugg optimized the design of the mobile debris fence used at motorsport venues to comply with the requirements for road works in a tunnel. The NORDBETON motorsport concrete barriers have been changed to standard NORDBETON public roadwork concrete barriers. Additionally, the debris fence panels have been extended to the on-site tunnel height and stabilized accordingly. They are telescopic and can be braced in the tunnel ceiling. Das System ist in der Höhe zwischen zwei und vier Metern anpassbar.

客户

Arge Nordring Los 4

承包商

Geobrugg AG

工程

Geobrugg AG

分包商

NORDBETON GmbH

其他安装的应用程序

冲击防护

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址