スイス
スイス

myGeobrugg

ロードセーフティバリア - Weiglmühler Berg 2021

A mobile road fence has been permanently installed

ロードセーフティバリア - Weiglmühler Berg 2021

The fence follows the road layout

ロードセーフティバリア - Weiglmühler Berg 2021

Thanks to mobile installation without drilling holes, the requirements for a water protection area are met

 
 

システム延長

- 80 m

 

設置年

2021

状況

This local road had to be protected from falling debris. Since the area is also a water protection area, it is impossible to install netting at the slope.

説明

Geobrugg installed a mobile rockfall protection fence as a permanent solution. The advantage of this system is that it can be deployed quickly and flexibly. No anchors have to be drilled, which could impact the water protection area.

The fence is 80 meters long and has curved elements.

顧客名

Staatliches Bauamt Rosenheim

落札者

HTB Baugesellschaft m.b.H.

保護対象

道路

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム