スイス
スイス

myGeobrugg

 - Kaikoura State Highway 1 (SR14) 2017

Looking North - 4 m RXE-2000 hybrid attenuator with drape: on the left side TECCO® G65/3

 - Kaikoura State Highway 1 (SR14) 2017

Looking South - the SH1 protected by the 4 m high RXE-2000 hybrid attenuator with drape

 - Kaikoura State Highway 1 (SR14) 2017

Looking West SH1 - rockface with hybrid attenuator with drape

 

設置年

2017

状況

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750,000 m³ of material from source zones up to 500 m above sea level.  The highly fractured greywacke meant frequent future shallow landslides had to be expected. Barriers in several locations were necessary before the reopening of the SH1 road and railway below.

The rockfall frequency requires for a system that attenuates the rockfall energy to a manageable level, minimises maintenance and enables easy clearing.

説明

A 4 m RXE-2000 rockfall barrier was modified into an 89 m Hybrid Attenuator with a 12/3/350 ROCCO® ringnet tail. This system enables the rockfall energy to be attenuated and guided into a catchment area at the toe of the slope for easier clearing maintenance.

The post spacing is between 8 and 12 m depending on topography. Several more attenuator systems are planned along the corridor where there is sufficient space at the bottom of the slope for retainment.

Read more about the other Kaikoura projects:

顧客名

NCTIR /NZTA

落札者

Geovert

保護対象

道路

腐食防止

ジェオブルッグ ウルトラコーティング

その他設置済み工法

落石対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム