Szwajcaria
Szwajcaria

myGeobrugg

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

View from the protected road of two barriers: On the line 1.1 (2000 kJ, H = 6 m) installed on the bare rock face and on the line 1.7 (2000 kJ, H = 5 m) installed on a very steep and high slope.

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

Technical pre-approval of the line 1.2 (1500 kJ, H = 6 m).

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

View from above the line 1.3 (1000 kJ, H = 6 m).

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

In anticipation of small diameter falling rocks on the line 1.2 (1500 kJ, H = 6 m), a very fine secondary mesh was installed (25 mm x 25 mm) along with the barrier.

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

View of heavy traffic and the rockfall barrier protecting the road from above the 1.2 line.

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

The very same day of installation acceptance by the customer (ASTRA - Federal Roads Office), several blocks were successfully retained by the line 1.9 (2000 kJ H = 5 m, adapted to withstand snow pressure).

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

View of the lines 1.9, 2.0 and 2.2 (all 2000 kJ, H = 5 or 6 m). Due to their location, they are also adapted to withstand snow pressure.

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

Impact October 2019 and the protected road

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

Rockfall impact October 2019

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

Successful rockfall protection

Ochrona przed obrywami skalnymi - Balmi-Tschuggen 2015

" ... blocks of about 3.5 Cubic meter ..." (Jungfrau Zeitung, November 1st, 2019)

 

Dlugosc systemu od

16 m - 80 m

 

Rok Instalacji / Montazu

2015

Sytuacja początkowa

The existing rockfall barriers above national highway A8 over the Brünig Pass were greatly weakened after years of prevalent heavy snowfalls and had to be replaced. Therefore, the Swiss Federal Roads Office (ASTRA) in 2014 invited IMPULS AG to consult the new project (installed by Gasser Felstechnik AG).

Opis zastosowanego rozwiazania

A total of eleven lines* with energy absorption capacities between 1,000 and 2,000 kJ were installed:

1000 kJ: height = 6 m, length = 30 m

1500 kJ: height = 6 m, length = 56 m

2000 kJ: height = 5 m and 6 m, length = 122 m

In addition, five lines were dimensioned for rockfall as well as for snow slide so that multi-hazard barriers  were installed:


2000
kJ: height = 5 m and 6 m, length = 139 m

* The RXI barriers used are now superseded by the RXE barriers.

Inwestor

Bundesamt für Strassen (ASTRA)

Wykonawca

Gasser Felstechnik AG

Chroniony Objekt

Road

Ochrona przeciwerozyjna

Galvanized

Projektant

IMPULS AG

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy