スイス
スイス

myGeobrugg

 - Bubichopf - BLS Goppenstein–Brig line 2010

-

 - Bubichopf - BLS Goppenstein–Brig line 2010

-

 - Bubichopf - BLS Goppenstein–Brig line 2010

-

 

システム延長

42 m

 

設置年

2010

状況

-

説明

In compliance with all the requirements, an RXI-100 rockfall protection barrier was installed, measuring 42.5 meters long by 4 meters high and with a distance of 8.5 meters between the posts. The maximum permitted barrier deflection after a 500 kJ event was verified and validated using FARO software. To guarantee compliance with a maximum net deflection of 3 m after a maximum rockfall event of 500 kJ, two additional GEOBINEX retaining ropes with brake rings were installed diagonally on each section of net. The special additional retaining ropes were affixed to separate anchors.

顧客名

BLS, Bern-Lötschberg-Simplon Bahn AG

保護対象

鉄道

エンジニアリング

Ing.büro Reinhold Bumann GmbH, Naters (Canton of Valais)

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム