スイス
スイス

myGeobrugg

 - JiJi Tour Line 2020

TECCO® G65/3 prevents unstable rocks from falling onto the railway line

 - JiJi Tour Line 2020

Rocky slope above the railway line before the installation of the mesh

 - JiJi Tour Line 2020

During installation of the mesh

 - JiJi Tour Line 2020

Installation of the spike plates which are part of the slope stabilizing system

 - JiJi Tour Line 2020

The flexible mesh following the contour of the terrain

 

システム

 

設置年

2020

状況

Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.

説明

The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.

落札者

Jin Xin Engineering Co., Ltd.

保護対象

鉄道

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

United Geotech, INC.

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム